Industrial Engineering and Production Management Online Quiz Mech Sub-Wise Quiz Quiz Questions 01. An event is a function of two or more activities. (A) Correct (B) Incorrect 02. The allowed time for a job equals standard time plus (A) Interference allowance (B) Policy allowance 03. Follow-up prescribes the sequence of operations to be followed. (A) Correct (B) Incorrect 04. Micro-motion study involves following number of fundamental hand motions (A) 12 (B) 16 05. Break even analysis represents the relationship between cost and volume. (A) True (B) False 06. Percent idle time for men or machines is found by (A) Work study (B) Work sampling 07. Slack may be positive, zero or negative. (A) Agree (B) Disagree 08. In which of the following layouts, the lines need to the balanced (A) Process layout (B) Product layout 09. Generally PERT is preferred over CPM for the purpose of project evaluation. (A) Yes (B) No 10. Basic motion time study gives times for basic motions in ten thousandths of (A) Second (B) Minute 11. A low unit cost can be obtained by following (A) Product layout (B) Functional layout 12. Father of industrial engineering is (A) Jack Gilbert (B) Gantt 13. Acceptance sampling is widely used in (A) Batch production (B) Mass production 14. In the perpetual inventory control, the material is checked when it reaches its (A) Minimum value (B) Maximum value 15. In the Halsey 50-50 plan, the following are rewarded more (A) Past good workers (B) Past poor workers 16. Queueing theory is associated with (A) Waiting time (B) Production time 17. In perpetual inventory control, the material is checked as it reaches its (A) Minimum value (B) Maximum value 18. Bar charts are suitable for (A) Major works (B) Minor works 19. The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode (A) Early finish (B) Early start 20. The performance of a specific task in CPM is known as (A) Event (B) Activity Submit Test Online Quiz Home Page