Power Generation Objective Questions - Set 09 - ObjectiveBooks

Power Generation Objective Questions - Set 09

Practice Test: Question Set - 09


1. Is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order,
    (A) Hot reserve
    (B) Cold reserve
    (C) Spinning reserve
    (D) Firm power

2. Large capacity generators are invariably
    (A) Water cooled
    (B) Natural air cooled
    (C) Forced air cooled
    (D) Hydrogen cooled

3. The efficiency of a plant is of least concern when it is selected as
    (A) Peak load plant
    (B) Casual run plant
    (C) Either (A) or (B)
    (D) Base load plant

4. The knowledge of diversity factor helps in determining
    (A) Plant capacity
    (B) Average load
    (C) Peak load
    (D) kWh generated

5. By the use of which of the following power factor can be improved?
    (A) Phase advancers
    (B) Synchronous compensators
    (C) Static capacitors
    (D) Any of the above

6. _______ will offer the least load.
    (A) Vacuum cleaner
    (B) Television
    (C) Hair dryer
    (D) Electric shaver

7. Direct conversion of heat into electric power is possible through
    (A) Fuel cell
    (B) Batteries
    (C) Thermionic converter
    (D) All of the above

8. Which of the following place is not associated with nuclear power plants in India?
    (A) Narora
    (B) Tarapur
    (C) Kota
    (D) Bangalore

9. Following power plant has instant starting
    (A) Nuclear power plant
    (B) Hydro power plant
    (C) Diesel power plant
    (D) Both (B) and (C)

10. The load factor of domestic load is usually
    (A) 10 to 15 %
    (B) 30 to 40 %
    (C) 50 to 60 %
    (D) 60 to 70 %