Practice Test: Question Set - 01
1. Which of the following lining material is useful for shield driven tunnels in sub aqueous regions?
- (A) Stone
masonry
- (B) Timber
- (C) Cast iron
- (D) Cement
concrete
2. Drift method of tunneling is used to construct tunnels in
- (A) Soft grounds
- (B) Rock
- (C) Self
supporting grounds
- (D) Broken
grounds
3. Assertion A: When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock.
Reason R: A
tunnel through rock, hard or soft, does not need any concrete lining
Select your
answer based on the coding system given below:
- (A) Both A and R
is true and R is the correct explanation of A
- (B) Both A and R
is true but R is not the correct explanation of A
- (C) A is true
but R is false
- (D) A is false
but R is true
4. Which one of the following tunneling methods is used for laying underground sewers?
- (A) Needle
beam method
- (B) Army
method
- (C) German
method
- (D) Italian
method
5. The correct sequence of drilling equipment for increasing size of holes in tunnels is
- (A) Wagon drill,
churn drill, shot drill
- (B) Wagon drill,
shot drill, churn drill
- (C) Shot drill,
churn drill, wagon drill
- (D) Churn drill,
wagon drill, shot drill
6. As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield
- (A) Remain same
- (B) Decreases
- (C) Increases by
2.25 times
- (D) Increases by
3.5 times
7. A good blast with a good yield is obtained if the cut hole is
- (A) Normal to
face
- (B) Inclined at
45° to the face
- (C) Inclined at
15° to the face
- (D) Inclined at
30° to the face
8. Which of the following is not a component of the shield?
- (A) Propelling
jacks
- (B) Liner plate
- (C) Hood
- (D) Tail
9. Which of the following methods of tunneling is used for long tunnels at great depths?
- (A) Army method
- (B) Needle
beam method
- (C) Austrian
method
- (D) English
method
10. Consider the following situations.
- Soil is soft.
- Volume of existing surface traffic on the alignment is heavy.
- Track is at a deeper level.
- Water table is high.
In the
construction of Metro Railways, “Cut and Cover” method of construction is
suitable in situations listed at
- (A) 1 and 2
- (B) 1 and 3
- (C) 1 and 4
- (D) 2 and 3
11. Which one of the following is a component of a shield for tunneling?
- (A) Liner plate
- (B) Trench jack
- (C) Stiffener
- (D) Cutting edge
12. Which of the following are percussion drills?
(i) Shot
drill
(ii) Diamond
drill
(iii) Wagon
drill
(iv) Churn
drill
Of these
statements
- (A) (i) and (ii)
are correct
- (B) (iii) and
(iv) are correct
- (C) (i) and (iv)
are correct
- (D) (ii) and
(iii) are correct
13. If ‘D’ is the diameter of tunnel in meters, then the thickness of lining in mm, as per the empirical formula is given by
- (A) 42 D
- (B) 82 D
- (C) 104 D
- (D) 124 D
14. Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?
- (A) It is
suitable for construction in unstable rocks
- (B) In
this method, it is easy to install timber support
- (C) Tunneling can be continuous and the work can be expedited
- (D) In
case of excessive water, it is easy to take correct steps
15. Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than
- (A) 2 m
- (B) 3 m
- (C) 4 m
- (D) 5 m