Industrial Engineering Objective Questions - Set 07 - ObjectiveBooks

Industrial Engineering Objective Questions - Set 07

Practice Test: Question Set - 07


1. In a functional organisation
    (A) Quality of work is better
    (B) Wastage of material is minimum
    (C) Specialized knowledge and guidance to individual worker is provided
    (D) All of the above

2. The amount deducted from the salary of workers towards employee’s provident fund is
    (A) Credited into reserves of company
    (B) Deposited in nationalized bank
    (C) Deposited in post office
    (D) Deposited in the account of worker with Provident Fund Commissioner

3. A dummy activity in a net work diagram
    (A) Is represented by a dotted line
    (B) Is an artificial activity
    (C) Does not consume time or resources
    (D) All of these

4. In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
    (A) A standard rating system
    (B) A merit rating system
    (C) A job evaluation system
    (D) His individual performance

5. PMTP (predetermined motion time systems) include
    (A) MTM (method time measurement)
    (B) WFS (work factor systems)
    (C) BNTS (basic motion time study)
    (D) All of the above

6. Routing assists engineers in deciding in advance
    (A) The flow of material in the plant
    (B) The methods of proper utilization of manpower
    (C) The methods of proper utilization of machines
    (D) The layout of factory facilities

7. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be
    (A) 300
    (B) 460
    (C) 500
    (D) 1000

8. Pick up the correct statement about relationship between various floats
    (A) Free float = total float
    (B) Independent float = total float
    (C) Independent float > free float
    (D) Independent float < free float

9. An activity of the project is graphically represented by ________ on the network diagram.
    (A) A circle
    (B) A straight line
    (C) An arrow
    (D) None of these

10. Break-even analysis consists of
    (A) Fixed cost
    (B) Variable cost
    (C) Fixed and variable costs
    (D) Operation costs

11. A-B-C analysis is used in
    (A) CPM
    (B) PERT
    (C) Inventory control
    (D) All of these

12. Standard time is defined as
    (A) Normal time + allowances
    (B) Normal time + idle time + allowances
    (C) Normal time + idle time
    (D) Only normal time for an operation

13. The type of layout used for manufacturing steam turbines, is
    (A) Product layout
    (B) Process layout
    (C) Fixed position layout
    (D) Any one of these

14. Motion study involves analysis of
    (A) Actions of operator
    (B) Layout of work place
    (C) Tooling and equipment
    (D) All of the above

15. Which one of the following represents a group incentive plan?
    (A) Scanlon Plan
    (B) Rowan Plan 
    (C) Taylor Differential Piece Rate System
    (D) Halsey Premium Plan