1. In process layout
    (A) Handling and backtracking of materials is too much
    (B) Production control is more difficult and costly
    (C) Routing and scheduling is more difficult
    (D) All of the above

2. Choose the wrong statement. Motion study is used for
    (A) Improving a work method
    (B) Improvising a work method
    (C) Designing a work method
    (D) Reducing inventory costs

3. Routing prescribes the
    (A) Flow of material in the plant
    (B) Proper utilization of man power
    (C) Proper utilization of machines
    (D) Inspection of final product

4. The objective of time study is to determine the time required to complete a job by
    (A) Fast worker
    (B) Average worker
    (C) Slow worker
    (D) New entrant

5. The main objective of work measurement is to
    (A) Plan and schedule of production
    (B) Formulate a proper incentive scheme
    (C) Estimate the selling prices and delivery dates
    (D) All of the above

6. Halsey plan of wage incentive
    (A) Is not applied to all level of workers
    (B) Is applied to all level of workers
    (C) Does not guarantee minimum wage
    (D) Is based upon efficiency of worker

7. The two bin system is concerned with
    (A) Ordering procedure
    (B) Forecasting sales
    (C) Production planning
    (D) Despatching and expediting

8. Pick up the correct statement from the following
    (A) Programmer evaluation and review technique is event oriented
    (B) Programmer evaluation and review technique is not event oriented
    (C) Critical path method is event oriented
    (D) None of the above

9. The main object of scientific layout is
    (A) To produce better quality of product
    (B) To utilize maximum floor area
    (C) To minimize production delays
    (D) All of these

10. Pick up the correct statement from the following
    (A) If the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
    (B) If the float of an activity is negative, delay in its performance is bound to delay the completion of project
    (C) If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
    (D) All of the above

11. In a line organization
    (A) Responsibility of each individual is fixed
    (B) Discipline is strong
    (C) Quick decisions are taken
    (D) All of these

12. In a PERT chart
    (A) All activities should be numbered
    (B) Only important activities should be numbered
    (C) Only critical activities are numbered
    (D) Only selected activities are numbered

13. In break even analysis, total cost consists of
    (A) Fixed cost + sales revenue
    (B) Variable cost + sales revenue
    (C) Fixed cost + variable cost
    (D) Fixed cost + variable cost + profit

14. Micro-motion study is
    (A) Enlarged view of motion study
    (B) Analysis of one stage of motion study
    (C) Minute and detailed motion study
    (D) Subdivision of an operation into therbligs and their analysis

15. Time study is carried out
    (A) By finding all the significant informations regarding the job, work place and machine tool etc
    (B) By breaking up each operation into small elements which are measurable with the help of the measuring device accurately
    (C) By observing and recording the time taken by the operator for an operation
    (D) All of the above