Practice Test: Question Set - 12
1. If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be
- (A) 2 HA
- (B) 1.33 HA
- (C) 1.5 HA
- (D) 1.15 HA
2. Which of the following conditions are necessary for applying linear programming?
- (A) These must
be a well defined objective function.
- (B) The decision
variables should be interrelated and nonnegative.
- (C) The
resources must be in limited supply.
- (D) All of the
above
3. In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
- (A) Complete details of
items in, waiting line are known
- (B) Arrival and waiting
times are known and can be grouped to form a waiting line model
- (C) All variables and
constants are known and form a linear equation
- (D) The laws governing
arrivals, service times, and the order in which the arriving units are taken
into source are known
4. According to Muther, the basic principle of best layout is
- (A) Principle
of overall integration
- (B) Principle
of flow
- (C) Principle
of flexibility
- (D) All of these
5. If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good
- (A) EF = ES + D
- (B) LS = LFD
- (C) LF = LS + D
- (D) All of the above
6. PERT/CPM, techniques can be used for following applications
- (A) Once through project
- (B) Maintenance jobs
- (C) Research and
development
- (D) All of the above
7. A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as
- (A) Gantt chart
- (B) Flow chart
- (C) Break-even chart
- (D) PERT chart
8. Work study is mainly aimed at
- (A) Determining
the most efficient method of performing a job
- (B) Establishing
the minimum time of completion of a job
- (C) Developing
the standard method and standard time of a job
- (D) Economizing
the motions involved on the part of the worker while performing a job
9. Standard time as compared to normal time is
- (A) Greater
- (B) Smaller
- (C) Equal
- (D) There is no such
correlation
10. Travel charts are used to
- (A) Analyze material handling
- (B) Determine
inventory control difficulties
- (C) Plan
material handling procedure and routes
- (D) All
of the above
11. One time measurement unit (TMU) in method time measurement system equals
- (A) 0.0001 minute
- (B) 0.0006 minute
- (C) 0.006 minute
- (D) 0.001 minute
12. Material handling in automobile industry is done by
- (A) Overhead crane
- (B) Trolley
- (C) Belt conveyor
- (D) All of the above
13. Which of the following statement is correct?
- (A) A-B-C
analysis is based on Pareto's principle
- (B) Simulation
can be used for inventory control
- (C) Economic
order quantity formula ignores variations in demand pattern
- (D) All
of the above
14. Product layout is employed for
- (A) Batch production
- (B) Continuous production
- (C) Effective utilization
of machine
- (D) All of the above
15. The technique of value analysis can be applied to
- (A) Complicated items
only
- (B) Simple items only
- (C) Crash programmer
items only
- (D) Any item.