Production Management MCQ - Set 03 - ObjectiveBooks

Production Management MCQ - Set 03

Practice Test: Question Set - 03


1. Critical path method
    (A) Helps in ascertaining time schedules
    (B) Makes better and detailed planning possible
    (C) Provides a standard method for communicating project plans schedules and to time and cost performance
    (D) All of the above

2. Critical Path Net Work helps an engineer
    (A) To concentrate his attention on critical activities
    (B) To divert the resources from noncritical advanced activities to critical activities
    (C) To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
    (D) All of the above

3. Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.
    (A) One-fourth
    (B) One-half
    (C) Equal to
    (D) Twice

4. In break-even analysis, total cost consists of
    (A) Fixed cost
    (B) Variable cost
    (C) Fixed cost + variable cost
    (D) Fixed cost + variable cost + overheads

5. Which one of the following techniques is used for determining allowances in time study?
    (A) Acceptance sampling
    (B) Linear regression
    (C) Performance rating
    (D) Work sampling

6. Expediting function consists in keeping a watch on
    (A) Operator's activity
    (B) Flow of material and in case of trouble locate source of trouble
    (C) Minimizing the delays
    (D) Making efficient dispatching

7. The most popular type of organisation used for Civil Engineering Constructions is
    (A) Line organization
    (B) Line and staff organization
    (C) Functional organization
    (D) Effective organization

8. Which one of the following chart gives simultaneously information about the progress of work and machine loading?
    (A) Process chart
    (B) Machine load chart
    (C) Man-machine chart
    (D) Gantt chart

9. Merit Rating is the method of determining worth of
    (A) A job
    (B) An individual employee
    (C) A particular division in workshop
    (D) Machine

10. Routing is essential in the following type of industry
    (A) Assembly industry
    (B) Process industry
    (C) Job order industry
    (D) Mass production industry

11. The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
    (A) Rowan Plan
    (B) Taylor Differential Piece rate system
    (C) Halsey Premium plan
    (D) Day work plan

12. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
    (A) Halsey plan
    (B) Gantt plan
    (C) Rowan plan
    (D) Emerson's efficiency plan

13. Bin card is used in
    (A) Administrative wing
    (B) Workshop
    (C) Foundry shop
    (D) Stores

14. The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
    (A) Product layout
    (B) Process layout
    (C) Fixed position layout
    (D) A combination of line and process layout

15. The disadvantage of product layout is
    (A) High initial investment for the specialized facilities
    (B) Skilled labour to operate machines
    (C) Production time is longer, requiring more goods in inventory
    (D) High cost of inspection