Industrial Engineering Practice Tests MCQ - Set 09 - ObjectiveBooks

Industrial Engineering Practice Tests MCQ - Set 09

Practice Test: Question Set - 09


1. In the Halsey system of wage incentive plan, a worker is
    (A) Paid as per efficiency
    (B) Ensured of minimum wages
    (C) Not paid any bonus till his efficiency
    (D) Never a loser

2. In order to avoid excessive multiplication of facilities, the layout preferred is
    (A) Product layout
    (B) Process layout
    (C) Group layout
    (D) Static layout

3. The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as
    (A) Dry work Plan
    (B) Halsey Premium Plan
    (C) Taylor Plan
    (D) Rowan Plan

4. The purpose of micro-motion study is to
    (A) Assist in finding out the most efficient way of doing work
    (B) Train the individual operator regarding the motion economy principles
    (C) Help in collecting the motion time data for synthetic time standards
    (D) All of the above

5. Monte Carlo solutions in queuing theory are extremely useful in queuing problems
    (A) That can't be analysed mathematically
    (B) Involving multistage queuing
    (C) To verify mathematical results
    (D) All of the above

6. For material transportation, conveyors are used when the prevailing conditions include
    (A) Loads are uniform
    (B) Routes do not vary
    (C) Materials move relatively continuously
    (D) All of these

7. The difference between the time available to do the job and the time required to do the job, is known as
    (A) Event
    (B) Float
    (C) Duration
    (D) Constraint

8. Which of the following statement is correct?
    (A) When slack of an activity is zero, it falls only on critical path.
    (B) CPM technique is useful to minimize the direct and indirect expenses.
    (C) Critical path of a net work represents the minimum time required for completion of project.
    (D) All of the above

9. The time which results in the least possible direct cost of an activity is known as
    (A) Normal time
    (B) Slow time
    (C) Crash time
    (D) Standard time

10. Which of the following statement is correct about the network diagram?
    (A) The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
    (B) The tail end of the arrow represents the start of an activity.
    (C) The head of the arrow represents the end of an activity.
    (D) All of the above

11. In PERT analysis, critical path is obtained by joining events having
    (A) +ve slack
    (B) -ve slack
    (C) Zero slack
    (D) Dummy activities

12. According to Rowan plan of wage incentive system, bonus is paid to a worker
    (A) Whose output exceeds 67% efficiency
    (B) On the percentage of time saved
    (C) On the percentage of time worked
    (D) On the percentage of standard time

13. Templates are used for
    (A) A planning layout
    (B) Flow of material
    (C) Advancing a programme in automatic machines
    (D) Copying complicated profiles

14. Line organization is suitable for
    (A) Sugar industries
    (B) Oil refining industries
    (C) Spinning and weaving industries
    (D) All of these

15. What does symbol 'V' employ in work study
    (A) Operation
    (B) Inspection
    (C) Delay/ temporary Storage
    (D) Permanent storage