Practice Test: Question Set - 17
1. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by
- (A) AP/C
- (B) 2AP/C
- (C) √(AP/C)
- (D) (AP/C)²
2. Discrepancies of bar chart techniques are
- (A) Consequential effects
of lack in one activity on the finish date
- (B) Free time available
for an activity can't be predicted
- (C) Effective
monitoring/controlling can't be done
- (D) All of the above
3. In jobbing production
- (A) Highly
skilled workers are needed
- (B) Unit costs
are high
- (C) Operations
are labour-intensive
- (D) All of these
4. Micro-motion study is
- (A) Analysis
of one stage of motion chart
- (B) Motion
study, when seen on a time chart
- (C) Subdivision
of an operation into therbligs and their analysis
- (D) Enlarged
view of motion study
5. Fixed position layout is also known as
- (A) Analytical
layout
- (B) Synthetic
layout
- (C) Static
product layout
- (D) None
of these
6. Job enrichment technique is applied to
- (A) Reduce labour
monotony
- (B) Overcome boring and
demotivating work
- (C) Make people happy
- (D) All of the above
7. Standard time is equal to
- (A) (Normal
time) - (allowances)
- (B) (Normal
time) + (allowances)
- (C) Representative
time multiplied by rating factor
- (D) Normal
time taken by an operation
8. Scheduling gives information about
- (A) When work should start and how much work should
be completed during a certain period
- (B) When work should
complete
- (C) That how idle time can be minimized
- (D) Proper utilization of machines
9. Bar chart is suitable for
- (A) Large
project
- (B) Major
work
- (C) Minor work
- (D) All of these
10. Material handling and plant location is analysed by
- (A) Gantt chart
- (B) Bin chart
- (C) Emerson chart
- (D) Travel chart
11. Scheduling
- (A) Prescribes
the sequence of operations to be followed
- (B) Determines
the programme for the operations
- (C) Is
concerned with starting of processes
- (D) Regulates
the progress of job through various processes
12. The process capability of a machine is defined as the capability of the machine to
- (A) Produces
a definite volume of work per minute
- (B) Perform
definite number of operations
- (C) Produce
job at a definite spectrum of speed
- (D) Holds
a definite spectrum of tolerance and surface finish
13. Process layout is also known as
- (A) Analytical-layout
- (B) Synthetic
layout
- (C) Static
product layout
- (D) None of
these
14. A milestone chart
- (A) Shows the inter
dependences of various jobs
- (B) Depicts the delay of
jobs, if any
- (C) Points outgoing ahead
of schedule of jobs, if any
- (D) None of the above
15. Pessimistic time is
- (A) The maximum time which an activity might
require
- (B) The average time
required for a job
- (C) The most probable
time considering all conditions
- (D) The minimum time in
which an activity can possibly be accomplished